Issuance of Credit Note against Coal Sale Refund for above Rs. 5 Lakhs - 02/01/2020
-
Issuance of Credit Note against Coal Sale Refund - 31/12/2019
-
Offer of rakes for Dec-2019 for Non-Power CSA consumers including Linkage Auction - 31/12/2019
-
Offer of rakes for Nov-2019 booked in Spot e-Auction - 30/12/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/SPOT e-Auction Consumers /Bidders-30/12/2019
-
Issuance of Credit Note against Coal Sale Refund for above Rs. 5 Lakhs - 27/12/2019
-
Revision of Surface Transportation charge from pit-head to loading point for all existing lead distance w.e.f. 00:00 Hrs of 25.12.19
-
Issuance of Credit Note against Coal Sale Refund - 26/12/2019
-
Revision of Surface Transportation Charges from Pit head to loading point of coal for all existing lead distance w.e.f. 25/12/2019
-
Extension of payment date against the allocation made to FSA consumers for the month Oct'2019.
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/SPOT e-Auction Consumers /Bidders-23/12/2019
-
Issuance of Credit Note against Coal Sale Refund - 20/12/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/SPOT e-Auction Consumers /Bidders-14/12/2019
-
Deposition of rake value for 01 Month's Scheduled Quantity, Financial Coverage and one rake Coal value by Rail Parties of Linkage
-
Notice to the CSA consumers for the allocation of coal by road for the month of Oct 2019
-
Offer of rakes for Nov-2019 booked in Spot e-Auction - 12/12/2019
-
Allocation of coal from temporary source by Road Mode for the month of Oct 19 and Nov 19 under change of mode of supply to linkage auction for Non Regulated Sectors - 09/12/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/SPOT e-Auction COnsumers /Bidders -09/12/2019
-
Issuance of Credit Note against Coal Sale Refund -07/12/2019
-
Offer of rakes for Nov-2019 booked in Spot e-Auction - 06/12/2019
-
'As Delivered Price' applicable in respect of Sucessful Bidders in Spot E-Auction Dt. 26/11/2019 by Rail Mode
-
Rescheduling of Linkage Auction Consumer's Meet - 10-12-2019 at 11.00 AM
-
Linkage Auction Consumer's Meet on 06/12/2019 at 11.00 AM
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/SPOT e-Auction COnsumers /Bidders -02/12/2019
-
Issuance of Credit Note against Coal Sale Refund -02/12/2019
-
Grade wise notified price for power and non power from mine spesific sources
-
Offer of rakes for Nov-2019 for Non-Power CSA consumers including linkage auction - 27/11/2019
-
'As Delivered Price' applicable in respect of Sucessful Bidders in Spot E-Auction Dt. 09/11/2019 by Rail Mode
-
Issuance of Credit Note against Coal Sale Refund -04/11/2019
-
Revised Price List for Power and Non Power From Mine Specific Sources
-
Grade wise Notified Price for Power and Non Power From Mine Specific Sources
-
Offer of rakes for Oct-2019 for Non-Power CSA consumers including linkage auction - 30/10/2019
-
Offer of rakes for Oct-2019 booked in Spot e-Auction - 25/10/2019
-
Documentary requirement in case of chnage of Name/Ownership - 14/10/2019
-
Issuance of Credit Note against Coal Sale Refund -14/10/2019
-
Date Extension of Issuance of Credit Note against Coal Sale Refund -11/10/2019
-
REVISED ROM PRICE OF WASHERY GRADE COAL W.E.F. 00:00 HOURS OF 29.09.19
-
'As Delivered Price' applicable in respect of Sucessful Bidders in Spot E-Auction Dated 28/09/2019 by Rail Mode
-
Extension of vailidity period of Delivery Order issued during 01/07/19 to 17/09/19 under all schemes by Road upto 31/10/19
-
REVISED ROM PRICE OF WASHERY GRADE COAL W.E.F. 00:00 HOURS OF 29.09.19
-
Notice to the successful bidders under NRS Tranche-IV of Auction of Coal Linkage regarding Time Extation for Execution of FSA - 28/09/2019
-
Offer of rakes for Sep-2019 for Non-Power CSA consumers including linkage auction - 25/09/2019
-
Notice to consumers drawing Coal supplies through FSAs executed under Linkage Auction Route - 24/09/2019
-
Regarding Beneficiary and value of Stamp Paper to be submitted alog with Bank Guarantee - 20/09/2019
-
Issuance of Credit Note against Coal Sale Refund -16/09/2019
-
Reporting of Mismatch in GSTR-2A - 07/09/2019
-
"Postponement of "Customer Meet" specifically for VIA is scheduled to be held on 05/09/2019 at WCL(HQ), at 11.00 AM
-
Grade-wise Notified Price for Coal Supply to Consumers allocated coal through Second Round of Auction under SHAKTI B(ii) Policy held on 22.05.2019
-
"Customer Meet" specifically for VIA is scheduled to be held on 05/09/2019 at WCL(HQ), at 11.00 AM
-
Outstanding dues against PI bills 16-17, 17-18 and 18-19 of Non Power FSA parties - 27/08/2019
-
Offer of rakes for Aug-2019 for Non-Power CSA consumers including linkage auction - 26/08/2019
-
Notice - CST Refund Claim upto June-2017 - 24/08/2019
-
Outstanding C Form in respect of Private Parties - 21/08/2019
-
Issuance of credit note against Coal Sales Refund - 21/08/2019
-
Offer of Coal from Sidings for Non-Power CSA Consumers drawing Coal by Rail of Aug'19 Entitlement - 19/08/2019
-
"Customer Meet" is scheduled to be held on 13/08/2019 at Chandrapur Area, AGM Ofiice, at 03.30 PM
-
Revision of Surface Transportation Charges from Pit head to loading point of coal for all existing lead distance w.e.f. 23/06/2019
-
CORRIGENDUM - "Customer Meet" at Nagpur Area
-
Issuance of credit note against indent of Coal Sales Refund for different areas - 03/08/2019
-
"Customer Meet" is scheduled to be held on 08/08/2019 at Pench Area, GM Ofiice, at 11.00 AM
-
"Customer Meet" is scheduled to be held on 09/08/2019 at Nagpur Area, GM Ofiice, at 11.00 AM
-
"Customer Meet" is scheduled to be held on 07/08/2019 at Umrer Area, GM Ofiice, at 11.00 AM
-
"Customer Meet" is scheduled to be held on 10/08/2019 at Wani North, GM Ofiice, at 03.00 PM
-
"Customer Meet" is scheduled to be held on 10/08/2019 at Pathakhera Area, GM Ofiice, at 11.00 AM
-
"Customer Meet" is scheduled to be held on 09/08/2019 at Video Conference Hall, Kanhan Area, GM Ofiice, at 11.00 AM
-
"Customer Meet" is scheduled to be held on 06/08/2019 at Conference Hall, Ballarpur Area, GM Ofiice, at 6.00 PM
-
"Customer Meet" is scheduled to be held on 05/08/2019 at Wani Area, GM Ofiice, Tadali at 3.00 PM
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/ SPOT e-Auction Consumers/Bidders - 29/07/2019
-
Corrigendum - Rectification of Allotment of coal from temporary source by Road Mode for the month of June'19 to M/s BGPPL (Other) - 27/07/2019
-
Offer of rakes for July-2019 for Non-Power CSA consumers including linkage auction - 25/07/2019
-
Issuance of credit note against Coal Sales Refund - 23/07/2019
-
"Customer Meet" is scheduled to be held on 26/07/2019 at WCL(HQ) at 11.00 AM
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/ SPOT e-Auction Consumers/Bidders - 22/07/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/ SPOT e-Auction Consumers/Bidders - 15/07/2019
-
Allocation of coal from temporary source by Road Mode for the month of May 19 and June 19 under change of mode of supply to linkage auction for Non Regulated Sectors - 13/07/2019
-
Offer of Coal from Sidings for Non-Power CSA Consumers drawing Coal by Rail of July'19 Entitlement - 13/07/2019
-
"Performance Incentive - Non Power for the FY 2018-19 - 11/07/2019
-
"Customer Meet" Specifically for e-Auction customer & Non Power FSA Consumers (FSA, Linkage Auction) is scheduled to be held on 26/07/2019 at WCL(HQ) at 11.00 AM
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/ SPOT e-Auction Consumers/Bidders - 08/07/2019
-
Offer of rakes for July-2019 booked in Spot e-Auction - 05/07/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction)/ SPOT e-Auction Consumers/Bidders - 01/07/2019
-
Revision of Bid Price for Bhatadi OCM for Spot e-Auction held on 21/05/2019 and 13/06/2019
-
Revision of Bid Price for Kolarpimpri OCM for Special Forward e-Auction held on 25/04/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction) & SPOT e-Auction Consumers/Bidders - 24/06/2019
-
Offer of rakes for June-2019 for Non-Power CSA consumers including linkage auction - 25/06/2019
-
Issuance of credit note against Coal Sales Refund - 21/06/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction) & SPOT e-Auction Consumers/Bidders - 17/06/2019
-
"As Delivered Price" applicable in respect of Successful Bidders in Spot E-Auction Dt. 13/06/2019 by Rail Mode - 15/06/2019
-
Offer of Coal from Sidings for Non-Power CSA Consumers drawing Coal by Rail of June'19 Entitlement - 14/06/2019
-
Issuance of credit note against indent of coal sale for different areas - 13/06/2019
-
Notice for Non Power CSA Consumers Taking Coal By Rail - 12/06/2019
-
Notice for Non Power CSA Consumers (Including CPP/LOA/Linkage Auction) taking Coal by Rail - 10/06/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction) & SPOT e-Auction Consumers/Bidders - 10/06/2019
-
Offer of rakes for May-2019 for non-power CSA consumers including linkage auction - 27/05/2019
-
Issuance of Credit Notes against Bid Security Refund - 25/05/2019
-
Adjustment of refundable amount of WCL consumers - 24/05/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction) & SPOT e-Auction Consumers/Bidders - Dt:16-05-2019
-
Offer of Coal from Sidings for Non-Power CSA Consumers drawing Coal by Rail of May'19 Entitlement - Dt:16-05-2019
-
Consent for issue of credit note against coal value refund
-
Pending recovery from consumers of WCL as on 31/03/2019
-
Revision in Security Deposit Amount for successful bidders of Gokul OCM in Linkage Auction due to upgradation of coal grade wef 00.00 hrs of 01/04/2019
-
Allocation of Coal from Temporary Source by Road Mode for the month of Mar'2019 & Apr'2019 under Change of Mode of Supply to Linkage Auction for Non Regulated Sectors - 08/05/2019
-
Adjustment of refundable amount of WCL consumers - 06/05/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA (Including CPP/LOA/Linkage Auction) & SPOT e-Auction Consumers/Bidders
-
Notice for prospective Bidders of Spot e-Auction to be held on Dt. 02/05/2019
-
Corrigendum to the Notice of e-Auction scheduled to be conducted on 02.05.2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA - 25/04/2019
-
Offer of rakes for April-2019 for non-power CSA consumers including linkage auction
-
Notice for successful Bidders of Special Forward e-Auction Dt.25/04/2019
-
Financial Coverage amount for Linkage Auction Rail mode consumers - 25/04/2019
-
Adjustment of refundable amount of WCL consumers - 23/04/2019
-
Corrigendum to the Notice for Special Forward e-Auction for Power Producers (excluding CPPs) for the period Apr'19 to Sep'19 - 22/04/2019
-
Performance Incentive bills of Private parties for Phase - I & Phase - II for FY 2017-18 - 18/04/2019
-
Weekly Coal Rake Loading Programme A/C Non Power CSA - 18/04/2019
-
Notice to Outstanding dues of Short Lifting Compensation claim for the year 2015-16 - 16/04/2019
-
Notice for Non-Power CSA Consumers drawing Coal by Rail Offer of Coal from Sidings for the Month of Apr'19 Entitlement - 15/04/2019
-
Notice for Special Forward e-Auction for Power Producers (excluding CPPs) for the period Apr'19 to Sep'19 - 12/04/2019
-
Notice to Prospective Bidders of SPOT E-Auction to be conducted on 12/04/2019
-
Notice to the consumers Drwaing Coal by Road Mode under FSA and FSAs executed under Linkage Auction Route - 08/04/2019
-
Notice to the CSA consumers for allocation of Coal by Road - 08/04/2019
-
Procedure for refund of coal value/EMD and/or release/ despatch of coal against booking under Spot e-Auction Scheme consequent to Annual Declaration of Grades for the year 2019-20
-
Weekly Coal Rake Loading Programme A/C Non Power CSA-28/03/2019
-
Offer of Rakes for Mar'2019 for Non-Power CSA Consumers including Linkage Auction-27/03/2019
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Mar'19 Entitlement - 13/03/2019
-
Notice to all consumers Drwaing Coal through FSAs executed under Linkage Auction Route from Umrer OC - 02/03/2019
-
Offer of Rakes for Feb'2019 for Non-Power CSA Consumers including Linkage Auction-25/02/2019
-
Corrigendum - Rectification of Allotment of Coal from Temporary Source by Road Mode for the month of Jan'2019 to M/s JSW Steel Ltd. - 20/02/2019
-
Allocation of Coal from Temporary Source by Road Mode for the month of Jan'2019 & Feb'2019 under Change of Mode of Supply to Linkage Auction for Non Regulated Sectors - 19/02/2019
-
Notice for Non Power CSA Consumers (Including CPP/LOA/Linkage Auction) & e-Auction consumers Drwaing Coal by Rail - 11/02/2019
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Feb'19 Entitlement - 09/02/2019
-
Notice regarding Consumer Meet is Scheduled to be held on 14/02/2019 at 11.00 AM
-
Offer of Rakes for Jan'2019 for Non-Power CSA Consumers including Linkage Auction-28/01/2019
-
Notice to all Customers Drawing Coal by Road Mode
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Jan'19 Entitlement - 16/01/2019
-
Operation of separate Bank Account for Rail & Road Despatches - 16/01/2019
-
Notice for Bidders of Special Forward e-Auction Dt. 09/01/2019
-
Notice to all consumers drawing Coal by Road Mode - 29/12/2018
-
Notice to all consumers drawing Coal by Road Mode - 29/12/2018
-
Offer of Rakes for Dec'2018 for Non-Power CSA Consumers including Linkage Austion-28/12/2018
-
Updation of Revised STC rates in the Rate Calculator - 27/12/2018
-
Notice - Revision of Surface Transportation Charges from Pit head to loading point of coal for all existing lead distance w.e.f. 00.00 of 24/12/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Dec'18 Entitlement - 15/12/2018
-
Allocation of Coal from Temporary Source by Road Mode for the month of Nov'2018 & Dec'2018 under Change of Mode of Supply to Linkage Auction for Non Regulated Sectors - 12/12/2018
-
Notice for Non Power CSA Consumers (Including CPP/LOA/Linkage Auction) Drwaing Coal by Rail regarding Non Deposition of Coal Value - 10/12/2018
-
Adjustment of Refundable Amount of WCL Consumers - 07/12/2018
-
Notice to the FSA consumers for allocation of coal by Road Mode for the month of Nov'2018- 06/12/2018
-
Supply of Coal from Mine specific sources with add-on price
-
Offer of Rakes for Nov'2018 for Non-Power CSA Consumers including Linkage Auction-28/11/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Nov'18 Entitlement - 12/11/2018
-
Supply of coal from mine specific sources with add-on price
-
Allocation of Coal from Temporary Source by Road Mode for the month of Sept'2018 & Oct'2018 under Change of Mode of Supply to Linkage Auction for Non Regulated Sectors - 01/11/2018
-
Offer of Rakes for Oct'2018 for Non-Power CSA Consumers including Linkage Auction-29/10/2018
-
Refund of diffrence of weighted average e-Auction price and notified price as per order of Hon'ble High Court Dt. 04/08/2017 to Erstwhile Non Core Sector Consumers-24/10/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Oct'18 Entitlement - 22/10/2018
-
Notice to CSA Consumers - Annual documents for the year 2017-18 with regard to end use of Coal - 19/10/2018
-
Rectification of allotment of coal from Temporary Source by Road Mode - 19/10/2018
-
Allocation of Coal from Temporary Source by Road Mode for the month of Aug'2018 under Change of Mode of Supply to Linkage Auction for Non Regulated Sectors
-
Notice to consumers drawing coal supplies through FSAs executed under linkage auction route - 13/10/2018
-
Notice to consumers drawing coal supplies through FSAs executed under linkage auction route - 11/10/2018
-
Notice to the CSA Consumers - 04/10/2018
-
Offer of Rakes for Sep'2018 for Non-Power CSA Consumers including Linkage Auction-28/09/2018
-
Notice-Amount outstanding towards Performance Intencive bills dated 21/09/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Sept'18 Entitlement - 19/09/2018
-
Price Applicable for Delivery of Coal by Road Mode to Special Fwd E-Auction for power Dt. 24.04.2017 on change of mode from Rail to Road - 18/09/2018
-
Notice to all Power Utilities/State GENCOs/IPPs of WCL regarding supply of (-) 100 MM crushed coal-17/09/2018
-
Supply of coal on change of mode to Buyers of Special Forward E-Auction for Power, 2017-18, conducted on 24.04.2017, for notified rakes booked in Bundle Offer ID-C Ex Chargaon Siding.
-
Corrigendum : Rectification of Offer of Coal from Temporary Source by Road Mode for the month of July'2018 - 14/09/2018
-
Offer of Coal from Temporary Source by Road Mode for the month of July'2018 under Change of Mode of Supply to Linkage Auction for Non-Regulated Sectors - 12/09/2018
-
"As Delivered Price" applicable in respect of Successful Bidders in Spot E-Auction Dt. 03/09/2018 by Rail Mode - 06/09/2018
-
Offer of Coal from by Road Mode for the month of June'2018 under Change of Mode of Supply to NRS-Linkage Auction consumers - 30/08/2018
-
Revised Offer of Rakes for Aug'2018 for Non-Power CSA Consumers including Linkage Austion-29/08/18
-
Offer of Rakes for Aug'2018 for Non-Power CSA Consumers including Linkage Austion-27/08/2018
-
Notice to the consumers drawing coal by Road Mode (other than PUs/IPPs and Spot e-Auction) - 24/08/18
-
Notice Regarding Re-scheduling of Consumer Meet
-
Notice for all Consumers/Bidders whose units are located in Special Economic Zone- 21/08/2018
-
Notice Regarding Re-scheduling of Consumer Meet
-
Notice for all successful/prospective bidders of Spot e-Auction by Road Mode - 20/08/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of Aug'18 Entitlement - 16/08/2018
-
Notice to Erstwhile Non Core Sector Consumers claiming refund of diffference of weighted average price and notified price as per the order of Hon'ble High Court Dt. 04/08/2017
-
Notice to the all consumers - 06/08/2018
-
Notice to the consumers drawing coal by Road Mode (other than PUs/IPPs and Spot e-Auction) - 04/08/18
-
Offer of Rakes for July'2018 for Non-Power CSA Consumers including Linkage Austion-30/07/2018
-
Refund of diffrence of weighted average e-Auction price and notified price as per order of Hon'ble High Court Dt. 04/08/2017 to Erstwhile Non Core Sector Consumers
-
Notice to Erstwhile Non Core Consumers claiming refund of diffference of weighted average price and notified price as per the order of Hon'ble High Court Dt. 04/08/2017
-
Notice for Non Power CSA Consumers (Including CPP/LOA/Linkage Auction) Drwaing Coal by Rail regarding Non Deposition of Coal Value - 23/07/2018
-
Notice to customers Lifting Coal by Rail Mode (for PUS/IPPs/CSA Shakti)- 19/07/18
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the month of July'18 Entitlement - 17/07/2018
-
Revised Offer of Coal from Temporary Source by Road Mode for the month of May'2018 under Change of Mode of Supply to Linkage Auction for Non-Regulated Sectors - 10/07/2018
-
Revision of Surface Transportation charqe from pit-head to loading point of coal for all existinq lead distance w.e.f. 00:00 Hrs of 29.06.2018/a>
-
Notice to the consumers executed FSA under Linkage Auction route by Road Mode - 03/07/2018
-
Offer of Rakes for June'2018 for Non-Power CSA Consumers including Linkage Austion-29/06/2018
-
Notice for Non-Power Consumers taking Coal by Rail - 22/06/2018
-
Offer of Coal from Temporary Source by Road Mode against Ghugus New Siding for the month of May'2018 under Change of Mode of Supply to Linkage Auction for Non-Regulated Sectors - 20/06/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of June'18 Entitlement - 15/06/2018
-
Offer of Coal from Temporary Source by Road Mode for the month of May'2018 under Change of Mode of Supply to Linkage Auction for Non-Regulated Sectors - 07/06/2018
-
"As Delivered Price" applicable in respect of Successful Bidders in Spot E-Auction Dt. 05/06/2018 by Rail Mode - 07/06/2018
-
Tranche IV of Linkage Auction for Non-Regulated Sector (NRS) - 04/06/2018
-
Notice to the CSA consumers (other than PUs/IPP) drawing coal by Road Mode - 01/06/2018
-
Offer of Rakes for May'2018 for Non-Power CSA Consumers including Linkage Austion-29/05/2018
-
Adjustment of refundable amount of WCL consumers
-
Revision of Serface Transportation Charges from pit-head to loading point of coal for all existing lead distance wef 00.00 of 25.05.2018
-
Outstanding dues against Performance Incentive bill 2015-16 and 2016-17 - 26/05/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of May'18 Entitlement - 18/05/2018
-
Chanage of mode of dispatch from Rail to Road under Non-Requlated Sector FSA (Linkage Auction)-14/05/18
-
Notice for Adjustment of refundable amount of WCL consumers
-
Notice for Auction of Coal Linkages under Tranche-IV - 04/05/2018
-
Notice for the Successful Bidders of Special Forward e Auction dated - 30/04/2018
-
Offer of Rakes for Apr'2018 for Non-Power CSA Consumers including Linkage Austion.
-
Notice to customers drawing coal by Road and Rail Mode - 21/04/18
-
Debit Balance in Debtors ledger as on 31/12/2017
-
Notice to CSA consumers drawing coal by Road Mode - 13/04/18
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of Apr'18 Entitlement - 10/04/2018
-
Offer of Rakes for Apr'2018 booked in Spot e-Auction - 07/04/2018
-
Submission of Part-B/Annexure-V documents under Tranche-I, II & II Linkage Auction - 07/04/2018
-
"As Delivered Price" applicable for supply of coal from Temporary Source by Rod Mode against change of Mode for Linkage Auction for Non Regulated Sectors - 03/04/2018
-
Notice for the Successful bidders in the events conducted under various spot E-auction and Exclusive E-Auction - 31/03/2018
-
Offer of Rakes for Mar'2018 for Non-Power CSA consumers including Linkage Auction - 29/03/2018
-
Submission of revised Security Deposit, Performance Security, Financial Coverage - 29/03/2018
-
Notice for Non Power CSA Consumers (Includind CPP/LOA/Linkage Auction) Drwaing Coal by Rail-27.03.18
-
Notice to CSA consumers drawing coal by Road Mode - 26.03.18
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of Mar'18 Entitlement - 20/03/2018
-
Notice to power utilities and IPP - 15/03/2018
-
Notice to all customers (Other than PUs and IPP) - 15/03/2018
-
Notice to the Consumers under Spl. Fwd e-Auction for Power Producers held on 07-11-2017
-
Offer of Rakes for Mar'2018 for Non-Power CSA Consumers - 01/03/2018
-
Operation of separate Bank Account for Rail & Road despatches - 27/02/2018
-
Offer of Rakes for Feb'2018 for Non-Power CSA consumers including Linkage Auction - 26/02/2018
-
Notice regarding Consumers Meeting to be held on 22.02.2018 at 12.30 pm
-
Notice - Continuation of offer of additional coal supply to IPP/Gencos having FSA with subsidiary of CIL for Febuary-18
-
Notice for successful bidders of Exclusive E-Auction Dt. 20/09/2017
-
Revised "As Delivered Price" in respect of Successful Bidders of Spl. Forward e-Auction for Power (Dt. 24/08/2016 & 24/04/2017) drawing coal from various sources in WCL - 15/02/2018
-
Offer of Rakes for Feb'2018 booked in Spot e-Auction dt. 17/01/2018
-
Corrigendum - Applicability of Revised notiifed price wef 00.00 hrs of 9.1.2018 on coal despatches through all modes - 14-15/02/2018
-
Notice to the successful bidders of Spl. E-Auction for power 2017-18 conducted on 24/04/2017 and secured rakes from Chargaon Siding in Cr ROM G-12 Grade (Juna Kunada OC) - 09/02/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of Feb'18 Entitlement - 12/02/2018
-
Notice to the successful bidders of Spl. E-Auction for power prodducers-2015 & Special Forward e-Auction for power Producers for 2015-16, 2016-17 & 1017-18 - 12/02/2018
-
"As Delivered Price" applicable for supply of coal from Temporary Source by Rod Mode against change of Mode for Linkage Auction for Non Regulated Sectors - 09/02/2018
-
"As Delivered Price" applicable in respect of Successful Bidders in Spot E-Auction Dt. 31/01/2018 by Rail Mode - 08/02/2018
-
Notice -Outstanding Dues against Performance Incentive Bills 2016-17
-
Implementation of E-Way bill for coal sales where the value of each consignment exceeds Rs 50,000/-
-
Notice to the FSA Consumers under Linkage Auction route drawing coal by Road Mode
-
Revised 'As delivered price' in respect of consumers/bidders drawing coal from various sources in WCL due to revision in notified price wef 00:00 hrs of 09.01.2018
-
Offer of Rakes for Jan'2018 for Non-Power CSA consumers including Linkage Auction - 24/01/2018
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of Jan'18 Entitlement - 22/01/2018
-
"As Delivered Price" applicable in respect of Successful Bidders in Spot E-Auction Dt. 17/01/2018 by Rail Mode - 20/01/2018
-
Notice to all customers - 17/01/2018
-
Notice to the CSA Consumers-Annual documents for the year 2015-16 with regard to end use of coal-16/01/2018
-
Applicability of Revised notiifed price wef 00.00 hrs of 9.1.2018 on coal despatches through all modes.
-
NOTICE for Change of mode of supply under Linkage Auction for Non regulated sector - 10/01/2018
-
Revised Bid price for Special Forward E-Auction Bidders by Road Mode
-
Applicability of revised notified price wef 00:00 hrs of 09/01/2018 on coal despatches through all modes - 09/01/2018
-
Notice to the CSA Consumers-Annual documents for the year 2016-17 with regard to end use of coal-03/01/2018
-
Notice to all CSA Consumers drawing Coal by Road mode - 28/12/2017
-
Offer of Rakes for Dec'2017 for Non-Power CSA consumers including Linkage Auction - 22/12/2017
-
Applicability of "Evacuation Facility Charges" wef 00:00 hrs of 20/12/2017 on coal despatches through all modes - 20/12/2017
-
Notice for Non Power CSA Consumers (Includind CPP/LOA/Linkage Auction) Drwaing Coal by Rail-20/12/2017
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of Dec'17 Entitlement - 18/12/2017
-
Movement on transfer of Non Power (Linkage Auction) Rakes from SASTI Siding to WANI Siding - 16/12/2017
-
NOTICE - Change of mode of dispatch from Rail to Road for consumers of Linkage Auction for Non regulated sector and Special Forward / Exclusive E-Auction - 07/12/2017
-
Payment of Exice Duty, VAT/CST, Entry Tax (in case of consumers/ bidders lifting coal from Madhya Pradesh) on DMF Amount - 06/12/2017
-
Offer of Rakes for Nov'2017 for Non-Power CSA consumers including Linkage Auction - 28/11/2017
-
Notice for Non Power CSA Consumers (Includind CPP/LOA/Linkage Auction) Drwaing Coal by Rail-25/11/2017
-
Notice -Outstanding Dues against Performance Incentive Bills 2016-17
-
Notice for Non Power CSA Consumers Drwaing Coal by Rail offer of coal from sidings for the moth of Nov'17 Entitlement - 22/11/2017
-
Revision of Surface Transportation Charges wef 00:00 hrs of 22/11/17
-
Offer of Rakes for Oct'2017 for Non-Power CSA consumers including Linkage Auction - 30/10/2017
-
Notice for Non Power CSA Consumers (Includind CPP/LOA/Linkage Auction) Drwaing Coal by Rail-28/10/2017
-
Notice to the Consumers executed FSAs under Linkage Auction Route and drawing Coal by Road Mode - 28/10/2017
-
Notice Regarding Extention of Dates for coal value deposition for supply of coal against change of Mode under Linkage Auction for Non Regulated Sectors - 24/10/2017
-
Dispensation in deposition of Advance Coal Value for order booking under Special Forward Exclusive e-Auction
-
Acceptance of Rail Programme without advance Coal Value for Non-Power FSA Consumers having value paid order for the month of October-2017
-
CORRIGENDUM - "As Delivered Price" applicable for supply of coal from Temporary Source by Road Mode against change of Mode for Linkage Auction for Non Regulated Sectors - 17/10/2017
-
Notice Regarding Extension of Dates for Coal Value deposition for supply of coal against Change of mode under Linkage Auction for Non Regulated Sectors - 13/10/2017
-
Notice for Non Power CSA Consumers drawing Coal by Rail Offer of Coal from siding for the Month of Oct'17 Entitlement- 13/10/2017
-
Change of mode of supply under Linkage Auction for Non Regulated Sectors - 07/10/2017
-
Notice for Non Power CSA Consumers (Including Linkage/CPP/LOA) drawing Coal by Rail-21/09/2017
-
Change of Mode of supply under Linkage Auction for Non Requlated sector & under Special Forward e-Auction for Power - 19/09/2017
-
Notice for Non Power CSA Consumers drawing Coal by Rail Offer of Coal from siding for the Month of Sep'17 Entitlement- 19/09/2017
-
Notice for CSA Consumers drawing Coal by Road mode - 18/09/2017
-
Revised in "As Delivered Price" due to revision in certain components of Gross Sales Value w.e.f. 00 Hrs. of 01/09/2017 for consumers/bidders drawing coal through Rail mode-12/09/2017
-
Notice for Non Power FSA Consumers (Performance Incentive Bills) - 12/09/2017
-
Notice to All The Customers Drawing Coal from WCL
-
Coal Price Notification-01/09/2017
-
Notice for Non Power CSA Consumers (Including Linkage/CPP/LOA) drawing Coal by Rail-29/08/2017
-
Offer of Rakes for Aug'2017 for Non-Power CSA consumers including Linkage Auction - 29/08/2017
-
Relaxation in Eligibility Condition for participation by consumers of Non regulated sector in Linkage Auction
-
Auction of Coal linkages to Cement Sub Sector Under Non-Regulated Sector
-
Notice to all Consumers - ARV under GST ACT - 24/08/2017
-
Auction of Coal Linkages to Cement sub-sector under Non-Regulated Sector-Tranche-III
-
Meeting with consumers of all sub-sectors in relation to "Auction of Coal Linkages for Non-Regulated Sector - Tranche-III"
-
Notice for the successful Bidders in the Special Forward e-Auction for Power Producers held on 24/04/17
-
Notice for Non Power CSA Consumers drawing Coal by Rail Offer of Coal for the Month of Aug'17 Entitlement
-
Notice for Non Power CSA Consumers (Including Linkage/CPP/LOA) drawing Coal by Rail-02/08/2017
-
As delivered price for the successful Bidders drawing coal through Rail Mode in Spot E-Auction Dt. 31/07/17
-
Corrigendum - Notice for Non Power CSA Consumers (Including CPP/LOA) drawing Coal by Rail for depositing of Coal Value for offered month of Apr'17 - 02/08/2017
-
Notice for all successful bidders in Rail Mode of Special Forward e-Auction 2016-17 (Phase-III) - 01/08/2017
-
Notice for Non Power CSA Consumers (Including CPP/LOA) drawing Coal by Rail for depositing of Coal Value for offered month of Apr'17 - 01/08/2017
-
Offer of Coal to Non-Power LoA route consumers to the tune of 50% of the ACQ against the import component during 2017-18 - 31.07.2017
-
As delivered price for the successful Bidders drawing coal through Rail Mode in Spot E-Auction Dt. 17/07/17
-
Notice for Non Power CSA Consumers (Including CPP/LOA/LINKAGE AUCTION) drawing Coal by Rail-28/07/2017
-
MILESTONE ACHIEVEMENT NOTICES UNDER LOA
-
Notice for Non Power CSA Consumers drawing Coal by Rail Offer of Coal for the Month of July'17 Entitlement
-
Notice for Non Power CSA Consumers (Including CPP/LOA) drawing Coal by Rail for depositing of Coal Value for offered month of Mar'17 - 18/07/2017
-
Corrigendum - Revised "As Delivered Price" due to implementation ogf GST w.e.f. 00 Hrs. of 01/07/2017
-
Revised "As Delivered Price" due to implementation ogf GST w.e.f. 00 Hrs. of 01/07/2017
-
Notice for Despatch under all scheme after implementation of GST - 30/06/2017
-
Transfer of Non Power (Linkage e-Auction ) Rakes of Wani Sdg to Sasti Sdg for Apr'2017 & May'2017
-
Offer of Rakes for June-2017 for Non Power CSA Consumers including Linkage e-Auction - 27.06.2017
-
As delivered price for the successful Bidders in respect of Spot. E-Auction held on 23.6.17 by Rail Mode-28/06/17
-
Payment towards outstanding District Mineral Foundation Trust w.e.f 12.1.15
-
Notice - offer of coal to Non Power LoA route Consumers to the tonee of 50% of the ACQ against the domestic component during 2017-2018
-
Notice to the consumers executed FSAs under Linkage Auction Rpute and drawing Coal by Road Mode- 23/06/2017
-
Price Notification for Raw Coking Coal of WG-IV of Tandsi Mine in WCL w.e.f. 00.00 hrs of 01/04/2017
-
Meeting with ASMs, Officials of Area Sales Accounts and Area Sysytems Personnel regarding GST - 21/06/2017
-
Notice to all consumers drawing Coal under FSA and Auction - 15/06/2017
-
Notice for Non Power CSA Consumers drawing Coal by Rail Offer of Coal from Sidings for the Month of June'17 Entitlement
-
Notice for the FSA consumers drawing Coal by Road Mode- 14/06/2017
-
Revised "As delivered price" in respect of Special Fwd e-Auction consumers & Linkage auction consumers drwaing coal from through Rail mode due to revision in grades of various mines of WCL wef 00:00 hrs of 01/04/2017
-
Notice for all e-Auction bidders for informing GST Identification number - 09/06/2017
-
Notice to the FSA Consumers drawing coal by road mode- 08/06/2017
-
Submission of Annual Documents for the year 2015-16 with regard to end use of coal-07/06/17
-
Notice to the Consumers executed FSAs under linkage auction route and drawing coal by road mode- 30/05/2017
-
Notice for Non Power CSA Consumers (Including CPP/LOA) drawing Coal by Rail - 29/05/2017
-
Calculation of "As delivered price" in respect of FSA/MOU consumers drwaing coal from New Majri sec I & II and New Majri UG to OC Cost Plus mine by Rail mode due to revision in base price for the period Jan'17 to Jun'17 - 29/05/2017
-
Payment towards outstanding District Mineral foundation trust dues(DMF) wef 12.01.2015
-
Calculation of Coal Value and Financial Coverage Amount in respect of successful bidders of Linkage Auction who will draw Coal through Rail Mode - 19/05/2017
-
Notice for Non Power CSA Consumers drawing Coal by Rail Offer of Coal from Sidings for the Month of May'17 Entitlement
-
Notice for the Successful Bidders in the Special Forward E-Auction for power producers held on 24.04.2017
-
Notice to the Consumers Under CSA Dt.13/05/2017
-
Notice for spot e-Auction bidders Dt. 19/05/2017
-
Notice to the CSA Consumers Drawing coal By Road mode- 10/05/2017
-
Payment towards outstanding District Mineral foundation trust dues wef 12.01.2015
- "As delivered price" of various Coal Grades despatched through Rail Mode to Non Power Consumers-06/05/17
- Notice for the Successful Bidders under Special Forward E-Auction for power producers for the year 2017-18
- Corrigendum - Payment towards outstanding District Mineral foundation trust dues wef 12.01.2015
- Monthwise/Bidwise distributation of rakes in respect of Special Forward E-Auction for Power Producers 2017-18 (Phase - I) booked by Rail Mode held on 24.04.2017
- Payment towards outstanding District Mineral foundation trust dues wef 12.01.2015
- Calculation of As delivered prices for rail mode in respect of Spot E-Auction dated 28.04.17
- Offer of Rakes for April-2017 for Non-Power CSA Consumers including Linkage e-Auction-28.04.2017
- Corrigendum -Revised calculation of As delivered prices in respect of Special Forward E-Auction for Power Producers held on 24.04.17 by Rail Mode-27/04/17
- "As delivered price" in respect of Spl. E-Auction for Power Producers Dt. 24.04.17 by Rail Mode-26/04/17
- Revised date of consumers meet - 27.04.2017
- Notice regarding consumers meet to be held on 28.04.2017 at 11.00 AM
- Notice for the Successful Bidders in the Special Forward E-Auction for power producers held on 24/04/2017
- Notice to the CSA Consumers drawing Coal by Road mode - 18/04/2017
- Notice Regarding Change of Grades Under The Linkage Auction FSAs-15/04/17